Project Description
Water conservation has become one of the paramount concerns for Pakistan, as the water table is depleting with every passing day due to massive extraction and a rapidly increasing population. In the absence of water meters at the production, distribution, and consumer ends, the quantity of water produced, supplied, and lost cannot be accurately measured. There is a dire need to establish a correlation between the volume of water produced and the volume of water sold through proper water metering. Without water meters, it is impossible to accurately estimate the supply and demand of water resources. Implementing water metering will help reduce water losses, ease stress on the aquifer, and potentially prevent excessive pumping and extraction of groundwater.
Salient Features
| Project Cost: | PKR 9.3 Billion |
| Proposal Type: | Solicited with BOT |
| Concession Period: | 10 Years (excluding installation period) |
| Total Meters: | 711,265 |
| Sector: | Water Supply and Sanitation |
| Potential Impact: | The project is expected to conserve water resources, slow the declining rate of the groundwater table and reduce water losses. |
| Executing Agency: | Water and Sanitation Agency (WASA), Lahore |
|
Objectives
|
|
|
Current Status: |
|
| Private Party: |
Consortium of
|
| Special Purpose Vehicle titled, “XINLANG Lahore Water Metering (SMC-Private) Limited” registered with SECP | |